State Life Housing Society Lahore
The idea for State Life Housing Society was floated for the benefit of State Life and other insurance employees in the year 1988. It was registered by the Deputy Registrar Cooperatives under registration No. 1285 on 9-10-88. The society got the town planning of Phase – I done from M/S. NESPAK over an area of 2621 kanals. The planning was approved by the District Council Lahore on 03-10-1994. Revised plan of Phase – I over an area of 4150 Kanals is submitted to Nisthar Town for approval.
“Mission Statement”
Our mission is to provide a better quality of living to the people and residents of the society. We aim to do this through hard work and dedication and by putting the needs of our residents before everything else so that we can provide the highest quality and best possible services. We want to make sure that our residents feel secure and satisfied before anything else.
Salient Features

Parks
There are a number of fully developed parks in Phase – I with a total area of about 160 Kanal’s. Central Park is the largest park in a centralized location and is spread over an area of 50 Kanal’s having a lake and a small zoo.

Electricity
For providing electricity to the residents of Phase – I, we had applied to WAPDA for establishing a Grid Station in the Society for making electricity available to both the phases to which they agreed. At present the electricity is being supplied to the residents through one 400 KVA Transformer and four additional 200 KVA Transformers

Mosque
One mosque is in use of daily prayers and Jumma prayer in A-Block, Phase – I. It has an Area of 2.25 Kanal’s. Its covered area is 3059 sqft. Two other mosques are proposed one each in Block-E and Block-F.

Library
The central park has a double story building over there meant to be used as a Restaurant/Club and library. Although the library is not yet built and functional but soon it will be completed as well.

Sui Gas
Sui Gas that is considered an essential necessity now a days is available in State Life Cooperative Housing Society Lahore. So you don’t need to bother about re-filling of LPG cylinders.

Sewerage
There is a well-built sewerage system developed for the residents of the society. The total length of the sewerage system is 15.56 km for Phase – I with an additional of 4.82 km of rain water drainage network.